GKM Highways – Fast Lane News

GKM is proud to have recently participated with the improvement of major roadway constructions in Quebec, Ontario and New-Brunswick provinces notably for NA30, Highway 50, Terry Fox Expansion and Route 1- Gateway projects.    

Progress of consolidation, embankment stability, rates of settlement due to staged and surcharged loading, as well as pore pressure dissipation from vertical drains were measured with most common types of instrument used for embankment monitoring: 4500 piezometer series, 6400 casing and 6000 inclinometer probe,  1900 or 1950 settlement extensometers, 4651 settlement profiler system, and surveying settlement plates with rods.

For additional information, please contact us: info@gkmconsultants.com

Le commentaires sont fermés.